Who can turn a specification into a shipped commit?
“Stop after CI” is a short instruction with a large consequence. If a specification elsewhere says to publish automatically, which sentence reaches the operator? The delivery-command fixture made that conflict observable. It also makes a good way to read Architect OS: follow what changes hands, who can authorise the next action, and where the identifiers stop matching. Spec producer’s pilot
Start with the person running a release. They want to go home knowing that the commit they inspected is ready, and return later to publish it. Another maintainer must be able to see precisely where they stopped. For a person reading the delivery brief, this sounds simple. For an orchestrator, “ready”, “approved” and “delivered” describe different events. Collapsing them into a single green mark would make a late change of mind, a failed check and an actual publication almost impossible to distinguish. The original design fixture encodes the requested stopping point as a question answered before any code is written. The four recorded clarification questions
A specification could pass while saying almost nothing
In the producer’s baseline, substituting ok for every draft section earned a hard-output score of 1.00. The verifier caught a one-hour versus three-hour contradiction but missed conflicting instructions about publication. Both drafts reached the implementation question. The correction taught the producer to look for numbered requirements and acceptance criteria, and to compare explicit publication decisions referring to the same flag, value and target. On restart, it rechecks the saved gate. A planning reader can inspect a pending decision without answering it. Baseline, corrective replay and sourced decisions
The original delivery fixture still failed Define. In a second variant, three acceptance criteria were explicitly linked to their requirements in the testing draft. After 28 producer actions in each case, Architect OS read the corrected checkpoint in 832 ms. It refused the historical variant in 683 ms, with empty output. Both saved files remained byte-identical after the read. The shipped plugin ran over stdio with recorded clarifications and canned model responses. This measured the handoff, including process startup. Both run IDs, payload and timings
Follow one requirement across the page
The fixture calls the stop-before-publication requirement FR-002. Its acceptance criterion, AC-002, describes running the command with --until ci and observing where it ends. The testing paragraph also mentions a successful stop. For someone reading the brief, that seems sufficient. A program reading separate sections, however, needs to distinguish the test of this particular promise from an illustrative aside that happens to mention the same flag. A sentence can keep its vocabulary while losing the connection between what someone promised and what someone will check. Read the requirement, criterion and testing paragraph together
The producer gives that connection a form another program can inspect. A criterion has an identifier and explicit requirement references. A fragment in a comment, link destination or example does not satisfy the reference rule. The consumer can consequently detect a missing requirement or a criterion referring nowhere. Imagine changing the brief to stop after CI for only one of two publication targets. The references might still all resolve. Someone must still ask whether the observed result covers both targets. Traceability makes the question easier to locate. It cannot answer it by counting identifiers. Define v1 and its documented reference rules
The same run reaches a preview. Then it stops.
The modernised Spec producer exports a single Step proposal. It binds the run ID, requirement wording, acceptance IDs and file digests. Its old implementation checkpoint remains readable, but asking the updated producer to execute that path returns architect_os_required. Architect OS obtains launch policy from an operator-selected file. The specification cannot pick a shell command or grant approval by embedding words in a requirement. Producer boundary · Proposal construction · Operator policy and approval
Open the four attempt journals for 21 November. The first three completions carry the same ID, run_mwqfalyj_4mdjof. Define produced the handoff, the producer supplied its proposal, and Plan prepared an approval fingerprint. The fourth command tried to materialise the bundle without a decision. It exited 2 and its output digest is the hash of empty bytes. None of the four attempts carries producer usage. You can join the first three by run ID and see the refused fourth attempt in the experiment log. There is no build receipt for this preview. Four attempt journals · Experiment conditions
How to read one attempt journal
Start at the row marked prepare and find its matching attempt identifier. One row records a start, the other an exit. The latter names the run, the fingerprint of the command’s output and the approval fingerprint. These last two values serve different purposes. One identifies the exact bytes printed by this invocation. The other identifies the manifest the operator is asked to approve. A person inspecting a later execution needs to know which comparison they are making. Comparing every hash-shaped string on the page with every other one would produce mismatches in a healthy run. Inspect the paired rows for each command
Take a concrete change after the preview. If the team changes a question assigned to an exploratory agent, the inputs used to prepare the bundle have changed. Materialization recomputes the source and output fingerprints. An approval for the earlier preview cannot authorize the revised bundle. The decision is a local file, bound to the reviewed manifest. Its digest allows the host to detect a mismatch. Attesting who wrote that file would require a different mechanism. Nor does the act of preparing the preview answer the producer’s pending implementation question. The two decisions belong to different participants. Decision format and materialization checks
Where an alternative model actually participated
A second record from November 21 is a useful counterexample to the assumption that Claude must write the plan. A read-only Codex session requested GPT-6.2 Astra. In sixteen seconds it drafted a proposal covering three acceptance criteria. The stream recorded one agent message and no tool calls. Preparation accepted the resulting proposal and produced a pending preview. The run identifier in that record ends in wlwcgz. It differs from the producer-projection replay above. Both reached a preview, by different routes. Requested model, token counts and proposal fingerprint
The GPT session reported 17,503 input tokens and 234 output tokens. The input includes its host context. The served model identifier and monetary cost were unavailable. An engineering lead estimating a budget from this dossier therefore has a measured token observation with a named scope. Multiplying all four local command times by a model rate would mix a machine’s process startup with a provider’s work. Adding the usage of a separately benchmarked generation would also require evidence that the generation produced this checkpoint. A common date or task name cannot establish that link. How planning measurements can be joined
A valid bundle still needs permission to run
Approval fixes the intended bytes. At pre-admission, the host must still match them to the checkout, launcher, reviewed plan and roles that will actually run. The role specimens must exercise both acceptance and refusal and match the expected findings. A changed input, a different build model or a missing review invalidates the receipt. The current contract refuses missing or stale evidence before launching a session. The project still lists production issuance of these receipts from independently measured specimens as pending. Admission scenarios and controls · Host authority and outstanding work
Why check again so close to launch? Think about the difference between agreeing on a shopping list and receiving the parcel. The operator may have approved the right brief on Friday. On Monday the checkout selected for execution could be a different revision, or the builder could be paired with a reviewer different from the one the approval assumed. Both configurations can be individually meaningful. Only one is the configuration for which the host has evidence. The admission scenarios make those distinctions observable as decisions at the point where a session would actually begin. Examples of matching and mismatched admission evidence
A real build and a real refusal
For an actual Claude run, switch records to git-env-b, dated 18 November. The Step builder worked under SRT, Anthropic’s sandbox runtime. The host ran seven checks and a separate read-only reviewer found seven issues. The third brief names what the second review found, including the test that used the same helper on both sides of a comparison. This is a documented link between two passes. The run predates the measured Plan preview above. Builder, checker and reviewer record · Next brief · Read the investigation
A release manager can read the review record in either direction. From the finding, follow the corrective brief to see what work was assigned next. From the later brief, go back to the original finding to see which observation motivated it. The second direction matters when a later correction sounds persuasive on its own. If it addresses a different risk, the original one is still open. Here the defect was shared dependence on the same Git helper when producing the expected and observed answers. The subsequent brief asks for an independent observation. That is a concrete chain of reasoning across two work sessions. The correction requested from the next builder
Gate asks about a commit. Deliver can resume it.
Step’s review concerns a proposed change. Test Gate checks the committed tree and the expected scenario identities, mutation report and replay. In the separate briefs-b delivery, all 2,896 expected scenarios passed. The mutation runner stopped before writing its report. Gate refused, Deliver stopped there, and neither protected branch received the commit. If the missing report had counted as zero survivors, a failing measurement would have become a successful one. Gate’s counts and missing report
There is also a genuine Gate-to-Deliver link. For commit 979258a, the trial branch, local verdict and two CI jobs pointed to the same commit. The first invocation stopped at ready, after eight minutes. On resumption, Deliver reused the verdict and the same CI run, checked the two protected updates and finished in ten seconds. An independent read of the forge confirmed both heads, both ruleset evaluations and removal of the trial branch. Both invocations and independent verification
Those ten seconds measure a resumed delivery with existing evidence. The November 21 run measures a pending preview. An end-to-end cost or success rate would require following one authorised checkpoint, with its digests, through admitted sessions to a delivered commit. That measurement remains open. Scope of the integration replay
What a person taking over the release can establish
On the stopped delivery, the scenario count can be reconciled explicitly. Start with 2,876 expected scenarios, add 27 and remove seven. The 2,896 executed agree with that total. Then inspect the mutation report separately. The runner had a time limit on its preliminary pass, so the file never appeared. The team could tell an expensive measurement had failed to finish. The report offered no evidence either way about the faults it was meant to detect. That distinction gave the maintainer a concrete next job, diagnosing the measurement, while keeping both protected branches at their previous commits. The count reconciliation and the runner’s stopping condition
To reconstruct a delivery yourself, work backwards from the destination branch to the commit the forge accepted. Then ask which CI run and local verdict apply to that same commit. Only after that go looking for the Step that produced the change and the approved inputs it consumed. An honest reconstruction can stop halfway. In these archives one chain stops at a planning preview, another relates a review finding to its next brief, and a third reaches the protected branches. Keeping those stopping points visible gives the next maintainer a precise experiment to run.